/ arundel & baldewyne court /
Tottenham

Two new residential blocks on a live estate street, with the existing water main running through the footprint of both. Two water main diversions, designed with our consultant and approved by Thames Water, new water mains connections and service entries to both blocks, LV power supply infrastructure, Openreach and Virgin Media duct systems, and drainage, joint trenching, civils and reinstatement throughout. Final connections completing autumn 2026.

mdvolhbqfzptox6vybgr (1).png

/ Get in Touch /

Craig Elkins,

Head of Utilities 

​

Alexander James Utilities

Alexander House​

Building 10

Highbridge Industrial Estate

Oxford Road

Uxbridge

UB8 1LX

+44 (0) 208 961 5555

Alexander James Utilities specialises in developer-led utility infrastructure and large-scale project works. We do not typically undertake small domestic enquiries.